Cabineo Time Study
Increase production by at least 50%
Read MoreFalse Drawer Fronts with Tenso P-14
Set Zeta P2 to the 14mm depth setting for Tenso P-14 connectors on the back side of the drawer face Use stop square to create an outside reference fence Run 14mm deep P-System slots on back of drawer face Insert male Tenso P-14 halves into back side of drawer face Set Zeta P2 to the…
Read MoreSlat Wall with P-System
How it works: Determine and mark spacing for Tenso connectors Determine and mark spacing for each slat based on material thickness and reveal  Extend marks for reference on top and bottom Using a piece of scrap wood, cut spacers to match your reveal Connect spacers to a straight edge with hot glue near the ends…
Read MoreFace Frame Cabinets with P-System
How it works: Lay out connector slot location on the back side of face frames Set the stop square on Zeta P2 to the appropriate height Set the top adjustment knob to the correct setting Cut slots on the face frame Cut corresponding slots on cabinet boxes Install connectors Install pre-load clip Apply glue (when…
Read More